So, even though it doesn't look like things have been moving, they have but at a bit of a glacial pace. As of Friday, we got our building permit. The holdup was a change to the plans required by the Ontario Building Code. As a result, it was necessary to have the Committee of Adjustment review the change. This was not a public hearing, just a review by the Committee in camera. In addition, when we decided to use a fire sprinkler system we had to upgrade the domestic water line. So, all is ready for the shovel to go in the ground on Monday. Here are some computer renderings of the final exterior finish choices.
Sunday, 27 July 2014
Saturday, 14 June 2014
new property owners
Just, a short update. We closed on the land on Friday, June 13th. In addition our house on Forest Street is sold with the closing date Aug 12th. Construction start is slated for the first week of July.
Monday, 12 May 2014
Building Permit Drawings Completed
Not quite the schedule I was aiming for, however, we will apply for building permit this week. Modelling that Morrison Hershfield (http://www.morrisonhershfield.com/Pages/default.aspx) completed shows that the building should consume 53% less energy compared to the applicable compliance package. This modelling does not include the proposed heat recovery from solar gains on the building during the day (summer and winter) that will stored in a hot water tank for heating and hot water use. We will now start modelling this process to see how much hot water storage we need and whether we need to increase insulation levels to get to net zero energy use.
On another note, we have now put our house up for sale. I was a bit surprised when I analyzed the last 12 months of energy consumption. It was better (less) than I expected. We used 1900 cubic metres of natural gas for heating, cooking and hot water. We also used on average 225 kwhs of electricity per month. Here is the link to realtor website 854 Forest Street, Ottawa, Ontario
Wednesday, 23 April 2014
Appeal period ended
The appeal period for the City of Ottawa Committee of Adjustment decision to permit the construction of the Triplex has ended and there are no appeals. Currently, structural, mechanical, electrical and site grading and servicing plans are being completed. I am hoping that we will be able to apply for building permit sometime during the week of April 26th.
Wednesday, 9 April 2014
preliminary building permit drawings 331 Osgoode
The drawings are not 100% correct, but almost. You can see the floor plans below. We are still working on the exterior finishes. We will have a stucco board in a red brick type color, metal siding that could be teal or similar and wood, likely birch.
Site Plan
Basement
First Floor
Second Floor
Third Floor
Roof Top
Sunday, 6 April 2014
HVAC
The initial take on the equipment for the heating cooling and ventilation system are as follows (these are examples of the types of equipment we are considering):
1) HRV combi heating and cooling - DUPLEX 500 multi (http://www.atrea.cz/en/duplex-500-8000-multi)
2) Boiler - Vitodens_200 (http://www.viessmann.ca/en/Residential/Products/gas/Vitodens_200.html)
3) Cooling unit in stairwell - Thermoplus Console Water-Cooled Air Conditioners (http://www.thermoplus.com/product.php?id=117)
4) Hot Water storage tank(s) - RHEEM Marathon® thermal storage tanks (http://www.rheem.com/product/solar-water-heaters-marathon-thermal-storage-tank)
5) Gas Fireplace, one in each major space - Regency Horizon™ HZ30E (http://www.regency-fire.com/Products/Gas/Contemporary-Gas-Fireplaces/HZ30E.aspx).
We will also be using in floor radiant heating with some cooling
1) HRV combi heating and cooling - DUPLEX 500 multi (http://www.atrea.cz/en/duplex-500-8000-multi)
2) Boiler - Vitodens_200 (http://www.viessmann.ca/en/Residential/Products/gas/Vitodens_200.html)
3) Cooling unit in stairwell - Thermoplus Console Water-Cooled Air Conditioners (http://www.thermoplus.com/product.php?id=117)
4) Hot Water storage tank(s) - RHEEM Marathon® thermal storage tanks (http://www.rheem.com/product/solar-water-heaters-marathon-thermal-storage-tank)
5) Gas Fireplace, one in each major space - Regency Horizon™ HZ30E (http://www.regency-fire.com/Products/Gas/Contemporary-Gas-Fireplaces/HZ30E.aspx).
We will also be using in floor radiant heating with some cooling
Thursday, 3 April 2014
a basic concept
The design of this building includes several areas on the south side that are used to access the units, the access stairs and elevator. They will not be kept at room temperature, but at 5 degrees C in winter. We will also be harvesting heat from those spaces as soon as the temperature rises above 5. In addition, we will start cooling the units as soon as they become warmer than 22 degrees C. The heat will be placed in a hot water tank in the basement to provide hot water and heating at night or cloudy days.